Report of Study
Results
¡P
Ground
investigation fieldwork was completed in October 2005.
¡P
Baseline
gas monitoring and water sampling were conducted at and in the vicinity of
the Landfill Extension area.
¡P
A
half-year ecological survey had been conducted at and in the vicinity of
the Landfill Extension area.
¡P
Archaeological
survey completed in Aug 2005. No archaeological material was found in Tong To Shan Archaeological Site.
¡P
Traffic
Impact Assessment (TIA) completed in Sep 2005. TIA result shows that there
will be no adverse impact on the adjacent road network both during
construction and operation of the Landfill Extension since the Landfill
Extension will be operated after the closure of existing NENT Landfill. Sha Tau Kok Road has sufficient
capacity to carry the traffic flows to Year 2020.
¡P
DIA
completed in Aug 2005. The assessment result suggests that the Lin Ma
Hang Stream will unlikely be affected. Drainage impact to Ping
Yuen River
is minimal (See 3D illustration of DIA
results)"
¡P
Visual
impact to adjacent villages is illustrated by 3D presentation.
|